Dominion Virginia Power is proposing to build an 8.8-mile,
double circuit 138 kilovolt (kV) transmission line in portions of Wise County
and Russell County. The new facilities are necessary to connect the
proposed Virginia City Hybrid
Energy Center in Virginia City, Va., to the existing
electrical grid system.
Upon completion, this new station will generate
585 MW of electrical power, and existing electrical transmission
capabilities in the immediate area are inadequate to accept this power.