Hybrid Energy Center-Clinch River
138kV Double Circuit Transmission Line

Will Dominion require additional right-of-way? 

Yes, a new 120-foot right-of-way will be required.

Top
 

Will the right-of-way clearing impact me?

Yes, construction of the 120-foot right-of-way will involve removal of trees and vegetation. In rural areas, trees will be placed in piles along the edge of the right-of-way. Adjacent to homes, trees will be removed. If a property owner is interested in the logs for firewood, we will be happy to stack that wood to the side. If a property owner lives on one side of the wooded right-of-way and we are removing all the buffer between their home and the new line, we will work with that property owner to install low growing vegetation outside of our right-of-way to provide a visual screen between that home and the proposed line.

Top
 

Will Dominion repair damage due to construction?

Yes. Our easement agreement allows us ingress and egress over private roads of property owners crossed by the right-of-way. The Company, at its expense, will repair any private roads damaged by Dominion or its contractors during construction of the line or its future maintenance. In addition, we will reimburse property owners for crop damage, and repair or replace fences or gates if for some reason we should damage them.

Top
 

How long will construction last?

Construction will last approximately one year. Construction is scheduled to begin September 2009, and the transmission lines are scheduled to be placed in service by September 2010.

Top
 

What will be the environmental impacts to the area?

Because trees will be cleared in some areas, there will be some loss of habitat for some species, but other species that require open or meadow areas will benefit. Dominion will have the right-of-way surveyed for possible threatened or endangered animals, insects, or plants, and work with the appropriate State agencies to protect any species that may be found. Wetlands will be flagged in the field before construction begins. Any areas within 100 feet of streams will be cleared by hand rather than mechanized means. Temporary culverts and matting will be used if it is necessary for construction vehicles to go across streams and wetlands areas. A Phase I archaeological study will be prepared and any areas of archaeological importance will be flagged and protected before construction begins. Dominion submits annual Erosion and Sedimentation Control Specifications for the construction and maintenance of transmission lines to the Department of Conservation and Recreation for review and approval. This project will be included in the 2009 submittal when construction is expected to begin. These specifications are given to our contractors and require E&S control measures be in place before construction begins. Once construction is complete, the right-of-way will be rehabilitated.

Top
 

Will this new line affect the value of my property?

This is a difficult issue to address. Proximity of power lines to homes may be an issue for some people but is not for others. While some homebuyers may not want to purchase a home in the vicinity of transmission lines, others find the added buffer to other homes a benefit. This is also evidenced by the homes that have been built next to the existing right-of-way after the existing line was constructed and by many similar circumstances across our transmission system.

Top
 

Do I need to worry about Electric and Magnetic Fields?

Dominion Virginia Power is sensitive to public concern about the possible health effects of exposure to electromagnetic fields. We continually monitor EMF research and speak to our customers and employees regularly, sharing the latest information with them. The Virginia Department of Health in its final report on EMF research said,

"Based on the review and analysis of the exhaustive literature review and other research projects completed under the EMF-RAPID program, the Virginia Department of Health is of the opinion that there is no conclusive and convincing evidence that exposure to extremely low frequency EMF emanated from nearby high voltage transmission lines is causally associated with an increased incidence of cancer or other detrimental health effects in humans. Even if it is assumed that there is an increased risk of cancer as implied in some epidemiologic studies, the empirical relative risk appears to be fairly small in magnitude and the observed association appears to be tenuous. The studies published in the literature lack clear demonstration of a cause and effect relationship as well as a definitive dose-response gradient."

The company has formed an EMF Committee that tracks research and public discussion and makes recommendations to management. The Committee's latest EMF update is available for review. Additional information is available in following links:

Top
 

Where can I find more information about the project?

For more information regarding this project please contact Courtney Fisher at 1-800-215-8032, press #9 or Gail Lamm at 1-800-215-8032, press #2.